Tap here to place the main pipe
Real job · every number traces to a sheet
West Basement locker-room bathrooms
The below-slab PVC DWV waste for TOILET 047/048, LOCKERS 046/042, GROOMING 052, SHOWER 045, SHOWER 043 and SHOWERS ADA 038, read straight off the engineered drawing and built back up one piece at a time.
Watch it build
Ready — press Replay
Waste (W) — solid on P-100
Vent (V) — dashed on P-100
Outside the cut list
1. Pipe-cut list
Cut #, length, size and schedule. Tap a row to see where that piece sits on the drawing.
2. Install list
One row per cut number — the two fittings that piece glues between, and which port it lands on.
Where the drawing disagrees with itself
Surfaced, never averaged away
Sources
Fingerprinted at build time — every number above points back to one of these
Real job · fixtures → main → branches · every number traces to a sheet
Annex Bathroom DWV Demo
Watch it build
Ready — press Replay
Tap a fixture for its distance from a reference corner — north-south and east-west, never a diagonal.
Released — cut length confirmed
Released with a flag — scaled or stand-in fitting
Pending — withheld under an RFI, never installed here
Held — outside this scope
1. Pipe-cut list
Cut #, size, schedule, confirmed length or WITHHELD with its RFI. Tap a row to see the piece on the plan and the arithmetic behind it.
2. Install list
One row per cut number — the two fittings the piece glues between, which port, and which way each fitting faces.
Open questions (RFIs)
A withheld cut names the RFI holding it. Nothing here was guessed.
Where the drawings disagree
Surfaced, never averaged away
Sizing and sources
Fixture units, the code tables they were read from, and every file fingerprinted at build time